Fallstudien

The team has many years of experience in reducing costs and risk via clever design and material changes. Whilst materials everywhere are increasing, our objective is to allows cost cutting without reducing quality. Our services are paid from those savings. 

Illustrative engineering review: hands examine a compact dosing pump beside a drawing and caliper.
Beispiel Value Engineering

Risikominderung angesichts steigender Preise teurer Komponenten

€17 → €9

Stückkosten, einschließlich Herstellungskosten

Tungsten carbide parts are extremely expensive and double in costs in 2025/26. We were able to find to replace the Chinese supplier with an Austrian company, and combining two pressed parts into one, and using an exotic material alternative. Faster lead times, 30 day terms, elimination of 2 part tolerance risks and price stability and significant savings.

Conceptual wireframe illustration of three separate mechanical forms consolidated into one integrated form.

Example: Production process improvement

Adjusting a cable configuration and the installation process saved up to 40 minutes per day.

Example: Component redesign

The redesign of a small component improved customer satisfaction, product effectiveness and reduced spare part orders.

Questions for us?

Schedule a 15 minute zoom call to find out if the fit is right for your company.

30-minütigen Zoom-Termin buchen

Dienstag, Mittwoch oder Donnerstag um 11:00 oder 14:00 Uhr deutscher Zeit.

Kreatronic Zoom call request